Skip to content

To report a serious incident to DPC, as required by Section 85(2) of the Petroleum and Geothermal Energy Act 2000, licensees should phone the serious incident report no: (08) 8463 6666.

This register provides public access to environmental data as required under the Petroleum and Geothermal Energy Act 2000 and associated regulations.

On this page

eviro_imageProvision of this public register  is part of  a strategy to demonstrate  that there is transparency and accountability in decision-making processes.

Section 106 and Section 107 of the Petroleum and Geothermal Energy Act 2000 require that an Environmental Register be established for public inspection. These sections are intended to provide the means that will aid stakeholders in contributing to the establishment of environmental objectives and determining whether the regulatory objectives of the Act have been met.

This register contains information on the four areas of petroleum industry activity, which includes seismic surveying, drilling, pipelines and facilities, as administered by the Energy Resources Division.

The Act specifies that the following data will be contained in the register:

  • Environmental impact reports;
  • Criteria for the classification of regulated activities;
  • Classifications of regulated activities made by the Minister;
  • Statements of environmental objectives that have been approved under the Petroleum and Geothermal Energy Act 2000;
  • Reports provided under reporting obligations imposed by statements of environmental objectives;
  • Environmental impact assessments that affect regulated activities under the Development Act 1993;
  • Annual licensee compliance reports; and
  • Various transitional documents, which relate to ongoing activities.

The Minister has the discretion to include other data such as:

  • Fitness for Purpose Reports and Emergency Response Drill Reports subsequent to consultation with licensees;
  • Energy Resources Division Inspection and Audit Reports;
  • Locations of activities as points, lines or polygons in an open spatial standard format;

or as the Minister deems to be appropriate.

Criteria for Classifying the Level of Environmental Impact of Regulated Activities

On the basis of the information provided in the Environmental Impact Report (EIR) and in accordance with Section 98 of the Petroleum and Geothermal Energy Act 2000, the Minister, using a set of publicly developed and disclosed criteria, must classify the level of environmental impact of any proposed activity.

Criteria for Classifying the Level of Environmental Impact of Regulated Activites (PDF 232KB)PGRG004-1

SEO, EIR and ESA Reports

Copies of current Environmental Impact Reports (EIR), Environmental Significance Assessments (ESA) and Statements of Environmental Objectives (SEO) prepared by licenses are contained here, grouped in types of regulated activities.

For more information on SEO, EIR and ESA please refer to the Activity Approvals Process.

This section contains

Drilling Activity Reports

Santos

Drilling, Completions and Well Operations - Environmental Impact Report (PDF 7.1MB)
Dated November 2015

Drilling, Completions and Well Operations - Statement of Environmental Objectives (PDF 623KB)
Gazetted November 2015

Drilling, Completions and Well Operations - Environmental Significance Assessment (PDF 439KB)
Dated November 2015


Beach Energy Limited

Fracture Stimulation of Deep Shale Gas and Tight Gas Targets in the Nappamerri Trough in the Cooper Basin, South Australia - Environmental Impact Report (PDF 6.6MB)
Dated July 2012

Fracture Stimulation of Deep Shale Gas and Tight Gas Targets in the Nappamerri Trough in the Cooper Basin, South Australia - Statement of Environmental Objectives (PDF 355KB)
Gazetted August 2012

Fracture Stimulation of Deep Shale Gas and Tight Gas Targets in the Nappamerri Trough in the Cooper Basin, South Australia - Environmental Significance Assessment (PDF 61KB)
Dated July 2012

Pursuant to Section 134 (1) of the Petroleum and Geothermal Energy Act 2000, an extension of time was granted to Beach Energy Ltd to enable incorporation of fracture stimulation activities into the Beach Cooper Basin Petroleum Production Operations SEO. All extensions of time can be accessed via the Licence Register.


Senex Energy Limited

Fracture Stimulation of Oil Targets of the Eromanga Basin Formations in the Cooper Basin, South Australia - Environmental Impact Report (PDF 5.15MB)
Dated July 2015

Fracture Stimulation of Oil Targets of the Eromanga Basin Formations in the Cooper Basin, South Australia - Statement of Environmental Objectives (PDF 746KB)
Gazetted July 2015

Fracture Stimulation of Oil Targets of the Eromanga Basin Formations in the Cooper Basin, South Australia - Environmental Significance Assessment (PDF 743KB)
Dated July 2015


Production and Processing Activity Reports

South Australian Cooper Basin Joint Venture (operated by Santos Ltd)

Cooper Basin Production and Processing Operations - Environmental Impact Report (PDF 3.3MB)
Dated February 2003

Cooper Basin Production and Processing Operations - Addendum to Environmental Impact Report (PDF 1.6MB)
Dated June 2010

Cooper Basin Production and Processing Operations - Statement of Environmental Objectives (PDF 972KB)
Gazetted July 2010

Cooper Basin Production and Processing Operations - Environmental Significance Assessment (PDF 72KB)
Dated August 2003


Stuart Petroleum - Acrasia Field (Gibber Uplands)

Senex Energy
Beach Energy Limited

Cooper Basin Petroleum Production Operations - Environmental Impact Report (PDF 5.5 MB)
Dated November 2016

Cooper Basin Petroleum Production Operations - Statement of Environmental Objectives (PDF 952 KB)
Gazetted December 2016

Cooper Basin Petroleum Production Operations - Environmental Significance Assessment (PDF 800 KB)
Dated December 2016

Pursuant to Section 134 (1) of the Petroleum and Geothermal Energy Act 2000, an extension of time was granted to Senex Energy to enable a comprehensive review of the Cooper Basin Petroleum Production Operations (Gibber Uplands) SEO. All extensions of time can be accessed via the Licence Register.


Strike Energy Limited Multi-well Exploration and Appraisal Production Testing from Deep Coals in PEL 96

Air Liquide Australia Limited

Caroline Carbon Dioxide Purification Plant - Environmental Impact Report (PDF 1.6MB)
Dated November 2013

Caroline Carbon Dioxide Purification Plant - Statement of Environmental Objectives (PDF 551KB)
Gazetted December 2013

Caroline Carbon Dioxide Purification Plant - Environmental Significance Assessment (PDF 59KB)
Dated November 2013


Adelaide Energy Limited

Katnook and Ladbroke Grove Gas Plants - Environmental Impact Report (PDF 2.2MB)
Dated September 2002

Katnook and Ladbroke Grove Gas Plants - Addendum to Environmental Impact Report (PDF 3.2MB)
Dated April 2011

Katnook and Ladbroke Grove Gas Plants - Statement of Environmental Objectives (PDF 825KB)
Gazetted May 2011

Katnook and Ladbroke Grove Gas Plants - Environmental Significance Assessment (PDF 175KB)
Dated September 2002

Katnook and Ladbroke Grove Gas Plants - Addendum to Environmental Significance Assessment (PDF 40KB)
Dated May 2011

An extension of time was granted to Beach Energy Limited to enable a comprehensive review of the Katnook Gas Plant Production and Processing SEO which is available on the Licence Register.

Geophysical Activity Reports

Pipeline Activity Reports

In this section

Moomba to Adelaide Gas System Pipeline and Beverly Lateral Pipeline - Environmental Impact Report (PDF 4.1MB)
Dated June 2016

Moomba to Adelaide Gas System Pipeline and Beverly Lateral Pipeline - Statement of Environmental Objectives (PDF 900KB)
Gazetted July 2016

Moomba to Adelaide Gas System Pipeline and Beverly Lateral Pipeline - Environmental Significance Assessment (PDF 232KB)
Dated June 2016


Back to PL listing

PL 02 - Moomba to Port Bonython Liquids Line - SACBJV (Santos Ltd JV)

Moomba to Port Bonython Liquids Line - Environmental Impact Report (PDF 540KB)
Dated November 2007

Moomba to Port Bonython Liquids Line - Statement of Environmental Objectives (PDF 750KB)
Gazetted 2009

Moomba to Port Bonython Liquids Line - Environmental Significance Assessment (PDF 109KB)
Dated May 2006


Back to PL listing

PL 03 and 04 - South East Pipeline System - Epic Energy

South East Pipeline System - Environmental Impact Report (PDF 1.2MB)
Dated February 2004

South East Pipeline System - Statement of Environmental Objectives (PDF 794KB)
Gazetted November 2009

South East Pipeline System - Environmental Significance Assessment (PDF 81KB)
Dated June 2004


Back to PL listing

PL 06 - Angaston to Berri Transmission Pipeline and Murray Bridge (Riverland) Gas Pipeline - Envestra (SA) Ltd

Riverland Gas Pipeline - Environmental Impact Report (PDF 4.3MB)
Dated January 2003


Back to PL listing

PL 11 - Berri to Mildura Gas Pipeline - Envestra Ltd


Back to PL listing

PL 13 - Port Campbell to Adelaide Pipeline - SEA Gas Pty Ltd

Port Campbell to Adelaide Pipeline - Environmental Significance Assessment (PDF 613KB)
Dated February 2016


Back to PL listing

PL 16 - SESA Katnook/Ladbroke Grove Gas Pipeline - APT Pipelines (SA) Pty Ltd

SESA Katnook/Ladbroke Grove Gas Pipeline - Environmental Significance Assessment (PDF 32KB)
Dated September 2016


Back to PL listing

PL 17 - Jackson (Qld) to Moomba (SA) Pipeline - Santos Ltd

Construction and operation of this pipeline is in accordance with the South Australia Cooper Basin Joint Venture SEO for Production and Processing Operations. Refer to the following page for further information:

SACBJV Cooper Basin Production and Processing Operations


Back to PL listing

PL 18 - QSN Link Pipeline (Ballera Qld to Moomba SA) - Epic Energy (Qld) Pty Ltd

QSN Link Pipeline (Ballera Qld to Moomba SA) - Environmental Significance Assessment (PDF 267KB)
Dated March 2008

Geothermal Activity Reports

Paralana joint venture - Hydraulic fracture stimulation, Arrowie Basin (Petratherm Limited, Beach Energy Limited and True Energy Limited)

Hydraulic Fracture Stimulation - Environmental Impact Report (PDF 777KB)
Dated March 2011

Hydraulic Fracture Stimulation and Induced Seismicity - Statement of Environmental Objectives (PDF 426KB)
Approved and gazetted on March 2011

Hydraulic Fracturing Stimulation and Induced Seismicity - Risk Assessment (PDF 4.5MB)
Dated December 2010

Hydraulic Fracturing Stimulation - Environmental Significance Assessment (PDF 360KB)
Dated March 2011

Logistics Support Hub Activity Reports

Preliminary Exploration and Survey

Archived Reports

Archived activity reports have either reached their 5 year review period and have not been reviewed, or have been superseded by updated versions.

To access archived activity reports for the four areas of the petroleum industry, which includes seismic surveying, drilling, pipelines and facilities.

See Archived reports

Fitness-for-Purpose Assessments

Section 86A of the Petroleum and Geothermal Energy Act 2000 requires a licensee to carry out fitness-for purpose (FFP) assessments of their facilities at least once every 5 years. Such assessments must assess the risks of the facilities on public health and safety; the environment; and, where relevant, the security of supply of natural gas (so far as this maybe relevant). A report on the assessment must be prepared in accordance with Regulation 30 and submitted to the Energy Resources Division.

This section of the register contains the most recent reports on such assessments prepared by the licensee and submitted to the Energy Resources Division. In most cases, a copy of the report itself is not provided, however a note indicating its availability and details of how to obtain copy are included.

Cooper Basin Production Facilities

Senex Energy Production Facilities in PPL 208, 211, 215, 217 and 218 FFP Report 2015
Submitted 4 March 2015Currently under review

Pursuant to Section 134 of the Petroleum and Geothermal Energy Act 2000, an extension of time was granted to Senex Energy to allow the PPL 208, 211, 217 & 218 FFP Assessment Report to be submitted by 6 March 2015. Letter of extension of time located on licence register.

Senex Energy's Production Facilities FFP Report 2013-Notice of Availability(PDF 37.5 KB)
Dated April 2013

Beach Energy's Facilities and Flowlines in the Cooper Basin FFP Report 2013 - Currently under review

Pursuant to Section 134 of the Petroleum and Geothermal Energy Act 2000, an extension of time was granted to Beach Energy to allow the Beach Energy Cooper Basin SA FFP assessment report to be submitted by 6 March 2014. Letter of extension of time is located on the licence register.

Beach Energy's Facilities and Flowlines FFP Report 2008 (PDF 423.1 KB)
FFP Report for Beach Energy's facilities and flowlines in the Cooper Basin
Dated October 2008

Beach Energy PPL 62, 168 and 202 - Katnook and Ladbroke Grove Gas Plants FFP Report 2007 (PDF 1.0 MB)

Pursuant to Section 134 of the Petroleum and Geothermal Energy Act 2000, an extension of time was granted to Beach Energy Ltd to allow the PPL’s 62, 168 & 202 FFP assessment report to be submitted by 31 January 2007. Letter of extension of time is located on the licence register.

Pursuant to Section134 of the Petroleum and Geothermal Energy Act 2000, an extension of time was granted to Santos Ltd to allow the SACBJV FFP report to be submitted by 6 March 2015. Letter of extension of time is located on the licence register.

SACBJV FFP Report 2012 notice of availability(PDF 301 KB)
FFP Report for all well and production activities in the Cooper Basin operated by Santos Ltd
Dated November 2012

Pursuant to Section 134 of the Petroleum and Geothermal Energy Act 2000, an extension of time was granted to Santos Ltd to allow the SACBJV FFP report to be submitted by 29 April 2012. Letter of extension of time is located on the licence register.

SACBJV (Moomba) FFP Report 2006 (PDF 98 KB)
FFP Report for all well and production activities in the Cooper Basin operated by Santos Ltd
Dated 2006

SACBJV Well Activities FFP Report 2002 (PDF 57 KB)
FFP Report for all well activities in the Cooper Basin operated by Santos Ltd
Submitted as an addendum to the 2001 SACBJV Production Facilities FFP Report.

FFP Report for all production activities in the Cooper Basin operated by Santos Ltd
Dated 2001

PRL14 Drillsearch Flax Fitness for Purpose Assessment 2014
FFP Report for Drillsearch’s operations, including the Flax Facility, located within PRL 14
Submitted 30 October 2014

Pursuant to Section 134 of the Petroleum and Geothermal Energy Act 2000, an extension of time was granted to Drillsearch Energy Ltd to allow the FFP report for PRL 14 to be submitted by 31 October 2014. Letter of extension of time is located on the licence register.

Pursuant to Section 134 of the Petroleum and Geothermal Energy Act 2000, an extension of time was granted to Drillsearch Energy Ltd to allow the FFP report for PRL 14 to be submitted by 30 June 2014. Letter of extension of time is located on the licence register.

Pursuant to Section 134 of the Petroleum and Geothermal Energy Act 2000, an extension of time was granted to Drillsearch Energy Australia Ltd to allow the FFP report for PRL 14 to be submitted by 31 December 2013. Letter of extension of time is located on the licence register.

Otway Basin

PPL 21 - Caroline Gas Plant FFP Report 2007 (PDF 140 KB)

Pursuant to Section 134 of the Petroleum and Geothermal Energy Act 2000, an extension of time was granted to Air Liquide Australia Ltd to allow the FFP report for PPL 21 to be submitted by 31 May 2007. Letter of extension of time is located on the licence register.

PPL 21 - Caroline Gas Plant FFP Report 2001 (PDF 42 KB)

Pursuant to Section 134 of the Petroleum and Geothermal Energy Act 2000, an extension of time was granted to Air Liquide Australia Ltd to allow the Katnook Facility FFP report PPL 62 to be submitted by 30 June 2014. Letter of extension of time is located on the licence register.

Pipelines

Pursuant to Section 134 of the Petroleum and Geothermal Energy Act 2000, an extension of time was granted to Santos Ltd and Epic Energy to allow the PL 2 FFP assessment report to be submitted by 20 December 2012. Letter of extension of time is located on the licence register.

PL2FFPReport2007(PDF1.1MB)

PL2FFPReport2002(PDF625KB)

Pursuant to Section 134 of the Petroleum and Geothermal Energy Act 2000,an extension of time was granted to Santos Ltd to allow the PL 5, 9 & 15 FFP Assessment Report to be submitted by 30 April 2008. Letter of extension of time is located on the licence register.

Pursuant to Section 134 of the Petroleum and Geothermal Energy Act 2000, an extension of time was granted to APTO&M Services Pty Ltd to allow the PL6 FFP Assessment Report to be submitted by 30 April 2008. Letter of extension of time is located on the licence register.

PL6 FFP Report 2002 (PDF 425 KB)

PL 7 FFP Report 2005 (PDF)

Pursuant to Section 134 of the Petroleum and Geothermal Energy Act 2000, an extension of time was granted to Agility Management to allow the PL 7 FFP Report to be submitted by 28 February 2005. Letter of extension of time is located on the licence register.

Pursuant to Section 134 of the Petroleum and Geothermal Energy Act 2000, an extension of time was granted to Gorodok Pty Ltd to allow the PL 8 and associated facilities FFP Report to be submitted by 21 November 2012. Letter of extension of time is located on the licence register.

PL8 FFP Report 2005 (PDF)

Pursuant to Section 134 of the Petroleum and Geothermal Energy Act 2000, an extension of time was granted to Santos Ltd to allow the PL 5, 9 & 15 FFP Report to be submitted by 30 April 2008. Letter of extension of time is located on the licence register.

PL 11 FFP Report 2009 (PDF)

Pursuant to Section 134 of the Petroleum and Geothermal Energy Act 2000, an extension of time was granted to Epic Energy Ltd to allow the PL 15 FFP Assessment Report to be submitted by 31 July 2005. Letter of extension of time is located on the licence register.

PL 15 FFP Report 2008 (PDF)

Pursuant to Section 134 of the Petroleum and Geothermal Energy Act 2000, an extension of time was granted to Santos Ltd to allow the PL 15 FFP Assessment Report to be submitted by 30 April 2008. Letter of extension of time is located on the licence register.

Pursuant to Section 134 of the Petroleum and Geothermal Energy Act 2000, an extension of time was granted to Santos Ltd to enable the report to be prepared and submitted in line with the FFP Reports for PL’s 5 & 9 by 29 February 2008. Letter of extension of time is located on the licence register.

Low Level Official Surveillance Activities

Section 74 of the Petroleum and Geothermal Energy Act 2000 requires a mandatory licence condition which divides regulated activities carried out under a licence into those requiring 'high level surveillance' by the regulator and those requiring 'low level surveillance'. Activities for which a licensee demonstrates a high level compliance culture, the ability to comply with legislation, will be classified as low surveillance.

The criteria used by the Energy Resources Division to assess surveillance status is outlined in the Guidelines for Operator Classification (PDF 103 KB).

This section of the register contains Low level official surveillance classification letters.

Note: On 1 October 2009, the terminology in Section 74 of the Petroleum and Geothermal Energy Act 2000 was changed from "low/high level official supervision" to "low/high level official surveillance". Approvals granted prior to 1 October 2009 therefore refer to supervision status.

Low Level Surveillance Classification - Pipeline Operations (PDF 311 KB)
Letter dated 29 July 2016 - granting APA Group low level official surveillance for all pipeline operation activities conducted in South Australia.

Letter dated 3 July 2001- granting Air Liquide Australia Ltd low level official supervision for activities conducted under PPL 21.

Low Level Supervision Classification - Pipeline Operations (PDF 218 KB)
Letter dated 5 March 2008-granting APTO&M Services (formerly Origin Energy Asset Management) low level official supervision status for pipeline operation activities.

Historical references

Low Level Supervision Classification - All Pipeline Operations (PDF 65 KB)
Letter dated 25 January 2007-granting low level supervision status granted to Origin Energy Asset Management for all pipeline operation activities conducted in South Australia.

Low Level Supervision Classification - Pipeline Operations for Envestra licences (PDF 32 KB)
Letter dated 22 February 2005 - granting low level supervision status to Origin Energy Asset Management for pipeline operations under pipeline licences held by Envestra (SA) Ltd.

Low Level Supervision Classification - Pipeline Design, Construction & Operation Activities (PDF 66 KB)
Letter dated 17 January 2008 - granting Epic Energy Pty Ltd and each of its wholly owned subsidiaries low level supervision status for all pipeline design, construction and operation activities.

Historical reference

Low Level Supervision Classification - Pipeline Activities (PDF 76 KB)
Letter dated 5th December 2000 - granting Epic Energy (SA) Pty Ltd low level supervision status for all pipeline design, construction and operation activities.

Historical reference

Low Level Supervision Classification - Well Operations (PDF 56 KB)
Letter dated 14 September 2004

Company Environmental Audit Reports

Section 106 (f) of the Petroleum and Geothermal Energy Act 2000 requires reports provided by licensees to the Energy Resources Division that are under reporting obligations imposed by a Statement of Environmental Objectives to be contained in the Environmental Register.

The Energy Resources Division have company environmental audit reports for geophysical operations available for public inspection upon request.

To view a copy of the reports email dpc.petroleum@sa.gov.au

*PEL 182 - Jasmine 3D Seismic Survey Environmental Audit Report, Senex Energy
*PEL 90 - Jonothon 3D Seismic Survey Environmental Audit Report, Senex Energy
*PEL 638 - Mudrangie 3D Seismic Survey Environmental Audit Report, Senex Energy
*PEL 570 Delawere 3D Seismic Survey Environmental Audit Report, Santos Ltd
*PEL 630 - Playford East 3D Seismic Survey Environmental Audit Report, Bridgeport Energy Ltd
*PEL 630 - Playford West 3D Seismic Survey Environmental Audit Report, Bridgeport Energy Ltd
*PEL 637 - Bauhaus 3D Seismic Survey Environmental Audit Report, Santos Ltd

*PPL 66, 95, 140, 160, 238; PEL 513, 632 - Jacenza 3D Seismic Survey, Environmental Audit Report, Santos
*PEL 637 - Wilpinnie 3D Seismic Survey Environmental Audit Report, Senex Energy
*PEL 91 - Solidus 3D Seismic Survey Environmental Audit Report, Beach Energy

*PEL 101 - Coolibah Seismic Survey Environmental Audit Report, Drillsearch
*PEL 513 - MunathiriInfill 3D Seismic Survey Environmental Audit Report, Drillsearch
*PEL 91, 92 - Caseolus 3D Seismic Survey Environmental Audit Report, Beach Energy
*PEL 100, 102, 110, 182, 514; AAL 189 - Dundinna 3D Seismic Survey Environmental Audit Report, Senex Energy
*PEL 444 - Wingman 3D Seismic Survey Environmental Audit Report, Terra Nova Energy
*PPL 17, 18, 101 Gaschnitz Pilot 3D Seismic Survey Environmental Audit Report, Santos
*PEL 218 - Holdfast 2 Microseismic Survey Operations Report, Beach Energy
*PEL 568, 569 - Birdsville Ridge Gravity Survey Environmental Audit Report, Linc Energy
*PPL 6, 91, 140; PEL 513 - Cowralli Microseismic Survey Acquisition Report

*PEL 92 - Fusinis 2D Seismic Survey Environmental Audit Report, Beach Energy
*PEL 92 - Rincon 3D Seismic Survey Environmental Audit Report, Beach Energy
*PEL 218 - Regius 2D Seismic Survey Environmental Audit Report, Beach Energy
*PPL 17, 20, 35, 52, 55, 56, 68, 124, 154, 233, 238; AAL 164 - Greater Leleptian 3D Seismic Survey Environmental Audit Report, Santos
*PEL 88, 90, 110, 514 - Cordillo 3D Seismic Survey Environmental Audit Report, Senex Energy
*PEL 91, 92, 105 - Irus 3D Seismic Survey Environmental Audit Report, Beach Energy
*PEL 186 - Nunga Mia 3D Seismic Survey Environmental Audit Report, Beach Energy
*PEL 92 - Porcatus 2D Seismic Survey Environmental Audit Report, Beach Energy
*PPL 240; PRL 15; PEL 104, 111 - Lignum 3D Seismic Survey Environmental Audit Report , Senex Energy

*PEL 91 - Aquillus 3D Seismic Survey Environmental Audit Report, Beach Energy
*PEL 91 - Limbatus 3D Seismic Survey Environmental Audit Report, Beach Energy
*PEL 91 - Undatus 2D Seismic Survey Environmental Audit Report, Beach Energy
*PEL 103; PRL14, 17, 18 - Flax Juniper 3D Seismic Survey Environmental Audit Report, Acer Energy
*PEL 112 - Mulka 3D Seismic Survey Environmental Audit Report, Terra Nova Energy
*PEL 499 - Sarda Bluff 2D Seismic Survey Environmental Audit Report, AHAVA Energy
*PPL 66, 95, 140; AAL 163 - Nephrite 3D VSP and Micro Seismic Survey Environmental Audit Report, Santos

*PEL 82 - Hill view 3D Seismic Survey Environmental Audit Report, Meridian Resources
*PEL 92 - Calpurnus 3D Seismic Survey Environmental Audit Report, Beach Energy
*PEL 132 - Wooltana Airborne Gravity Survey Environmental Audit Report, President Petroleum
*PEL 494, 496; PRL 13 - Weatherall 2D Seismic Survey Environmental Audit Report, Adelaide Energy
*PEL 499 - Ammaroodinna 2D Seismic Survey Environmental Audit Report, AHAVA Energy

*GEL 178 - Paralana Microseismic Monitoring Study Environmental Audit Report, Petratherm
*GEL 181, 210 - Frome 2D Seismic Survey Environmental Audit Report, Geothermal Resources
*GEL 230, 278, 285, 407, 408 - Nilpena, Beltana and Port Augusta Seismic Survey Environmental Audit Report, Torrens Energy
*GEL 241 - Renmark MagnetoTelluric Survey Environmental Audit Report, Petratherm
*PEL 92 - Heliacus 2D Seismic Survey Environmental Audit Report, Beach Energy
*PEL 104, 111; PRL 15; AFL 149 - Mollichuta 3D Seismic Survey Environmental Audit Report, Victoria Petroleum
*PPL 122 - Tallerangie 3D Seismic Survey Environmental Audit Report, Santos
*PEL 138, 139, 499 - Trainor Hill 2D Seismic Survey Environmental Audit Report, AHAVA Energy

*PEL 91 & 92 - Modiolus 3D Seismic Survey Environmental Audit Report, Beach Energy
*PEL 92 - Padollus 2D Seismic Survey Environmental Audit Report, Beach Energy
*PEL 105, 206 - Wakefield 2D Seismic Survey Environmental Audit Report, Adelaide Energy
*PEL 117, 121, 122, 123 - Boorthana Trough 2D Seismic Survey Environmental Audit Report, SAPEX
*PEL 139 - Welbourn Hill 2D Seismic Survey Environmental Audit Report, AHAVA Energy
*PEL 154 - Burrungle 3D Seismic Survey Environmental Audit Report, Rawson Resources
*PEL 155 - Nangwarry 3D Seismic Survey Environmental Audit Report, Rawson Resources
*PEL 255 - Jacaranda Ridge 3D Seismic Survey Environmental Audit Report, Adelaide Energy
*PPL 25, 114 - Caroowinnie 3D Seismic Survey Environmental Audit Report, Santos
*PPL 176 - Callabonna 3D Seismic Survey Environmental Audit Report, Santos
*PPL 177 - Charo 3D Seismic Survey Environmental Audit Report, Santos

*GEL 157, 254 - Poontana 2D Seismic Survey Environmental Audit Report, Beach Energy
*GEL 158 - Ferguson Hill Magneto Telluric Survey Environmental Audit Report, Petratherm
*PEL 17, 19, 20, 29, 52, 56, 154, 180, 196 - Tirrawarra 3D Seismic Survey Environmental Audit Report, Santos
*PEL 95 - Scutus 2D Seismic Survey Environmental Audit Report, Beach Energy
*PEL 102, 103 - Rogan 3D Seismic Survey Environmental Audit Report, Stuart Petroleum
*PEL 106 - Spinel 3D Seismic Survey Environmental Audit Report, Great Artesian Oil & Gas
*PEL 107 - Ficus 2D Seismic Survey Environmental Audit Report, Beach Energy
*PPL 32,34 - Bookabourdie 3D Seismic Survey Environmental Audit Report, Santos
*PPL 32,37; PEL 107 - Kiana-Spencer-Muteroo 3D Seismic Survey Environmental Audit Report, Santos

*GEL 156, 178 - Paralana Magnetotelluric Survey Environmental Audit Report, Petratherm
*GEL 157 - Callabonna Magneto Telluric Survey Environmental Audit Report, Petratherm
*PEL  91, 92, 107 - Cadulus 2D Seismic Survey Environmental Audit Report, Beach Petroleum
*PEL 114; PPL 30, 36, 39, 149, 186, 206 - Bogito Kobari 3D Seismic Survey Environmental Audit Report, Santos
*PPL 182 - James 3D Seismic Survey Environmental Audit Report, Santos
*PEL 92 - Neritus 3D Seismic Survey Environmental Audit Report, Beach Petroleum

*PEL 90, 103 - Sprigg Extension 3D Seismic Survey Environmental Audit Report, Stuart Petroleum
*PEL 91, 92 - Mytilus 2D Seismic Survey Environmental Audit Report, Beach Petroleum
*PEL 94, 113 - Harpoono 3D Seismic Survey Environmental Audit Report, Stuart Petroleum
*PEL 95 - Discus 2D Seismic Survey Environmental Audit Report, Beach Petroleum
*PEL 101 - Kapok 2D Seismic Survey Environmental Audit Report, Innamincka Petroleum
*PEL 104, 111 - Wirraway 2D Seismic Survey Environmental Audit Report, Victoria Petroleum
*PEL 106 - Karla 2D Seismic Survey Environmental Audit Report, Great Artesian Oil & Gas
*PEL 106 - Paranta 3D Seismic Survey Environmental Audit Report, Great Artesian Oil & Gas
*PEL 108, 112 - Maryborough 2D Seismic Survey Environmental Audit Report, ACOR
*PEL 115 - Mirage 3D Seismic Survey Environmental Audit Report, Victoria Petroleum

*PEL 72 - Harris Flat 2D Seismic Survey Environmental Audit Report, Essential Petroleum Resources
*PEL 90 - Kiwi 2D Seismic Survey Environmental Audit Report, Stuart Petroleum
*PEL 113 - Zulu 2D Seismic Survey Environmental Audit Report, Stuart Petroleum
*Juniper 2D Seismic Survey Environmental Audit Report, Innamincka Petroleum
*Kachumba 2D Seismic Survey Environmental Audit Report, Cooper Energy
*Sellicks 3D Seismic Survey Environmental Audit Report, Beach Petroleum
*Worrior 3D Seismic Survey Environmental Audit Report, Stuart Petroleum
*Andracurrie 2D Seismic Survey Environmental Audit Report, Victoria Petroleum
*Paranta 2D Seismic Survey Environmental Audit Report, Great Artesian Oil & Gas
*Calabonna Regional Gravity Survey Environmental Audit Report, Petratherm
*PEL 91, 106 - Malleus 2D Seismic Survey Environmental Audit Report, Beach Petroleum
*PEL 94, 95 - Malleus South 2D Seismic Survey Environmental Audit Report, Beach Petroleum

*Albus 2D Seismic Survey Environmental Audit Report, Beach Petroleum
*Christies 3D Seismic Survey Environmental Audit Report, Beach Petroleum

*Gidgealpa 3D Seismic Survey Environmental Audit Report, Santos
*Nautilus A 2D Seismic Survey Environmental Audit Report, Beach Petroleum
*Nautilus B 2D Seismic Survey Environmental Audit Report, Beach Petroleum
*Nautilus C 2D Seismic Survey Environmental Audit Report, Beach Petroleum
*Pando 2D Seismic Survey Environmental Audit Report, Stuart Petroleum
*Maribu 2D Seismic Survey Environmental Audit Report, Stuart Petroleum
*Candra 2D Seismic Survey Environmental Audit Report, Stuart Petroleum
*Cooper Energy 2D Seismic Survey Environmental Audit Report, Stuart Petroleum
*Strombus 2D Seismic Survey Environmental Audit Report, Beach Petroleum
*Raven/Mounanga 3D Seismic Survey Environmental Audit Report, Santos
*Verona 3D Seismic Survey Environmental Audit Report, Santos
*Summer Hill Gravity Survey Environmental Audit Report, Origin Energy
*PEL 57 - Honans Scrub Seismic Survey Environmental Audit Report, Origin Energy

*Coonatie 3D Seismic Survey Environmental Audit Report, Santos
*Greater Strzelecki 3D Seismic Survey Environmental Audit Report, Santos
*Caladan/Daralingie 3D Seismic Survey Environmental Audit Report, Santos
*Murteree 3D Seismic Survey Environmental Audit Report, Santos
*PEL 57 - Summer Hill 2D Seismic Survey Environmental Audit Report, Origin Energy
*PEL 83 - St George 3D Seismic Survey Environmental Audit Report, Origin Energy

For more information, contact:

Energy and Resources Division

+ 61 8 8463 33204
dpc.petroleum@sa.gov.au